Allocate production costs and value WIP

Output cost starts with consumed components. Full production cost may also include labour and allocated overheads.

1 min read Open this screen in the demo
On this page 6

Allocate production costs and value WIP

Output cost starts with consumed components. Full production cost may also include labour and allocated overheads.

Before you start#

Select the correct entity or location and period. Prepare supporting documents; changes require the relevant permissions.

Open Inventory → Documents; production operation.

Step 1. Perform the operation#

Check the recipe, actual component quantities, units and output quantity. Ensure components have a cost before posting. Save the document and inspect output cost; for cutting, check the cost shares allocated to the outputs.

Step 2. Verify the result#

Reconcile component consumption with finished-goods receipts. Investigate incomplete-cost warnings: a missing price does not mean free materials. Correct the source while preserving history, then check cost again.

Limitations#

Troubleshooting#

Problem What to check
Output cost is zero or incomplete Check component costs at the operation date, units and output quantity.